Brick Paver Installation & Edging



Staging of product

A lot of paver projects will differ depending on gain access to, site conditions, task size and of course, the weather. Mindful consideration should be taken to figure out the time to start the paver installation.

The foreman or task manager must always have the materials (sand/ pavers) dispersed around the project website for easy and effective setups. Paver pallets/bundles should be put in a way not to interfere with the paver installation. The appropriate pallet/bundle placement can make the real project installation simpler and quicker by reducing the general labor of managing the material.

Brick paver patterns

Pavers can be put in several patterns depending on their shape. Each paver shape will generally have a number of various hatch patterns that are provided by the producer.

Contractors need to take into factor to consider the traffic weight loads on their paver projects. In a lot of applications worldwide, it has been shown that pavers laid in a herringbone pattern have carried out properly.

Pavers that are 60 mm (2 - 3/8 in) density are suitable for pedestrian applications. Pavers that are going to be used in industrial or industrial applications must be 80 mm (3 - 1/8 in) in density.

Reference/starting point for brick paver installation

There are a variety of conditions that identify the beginning point of a paver task.

When starting to install pavers it is best to snap a real straight chalk line on the surface of the bed linen sand or pull a true straight string line above the surface area of the bedding sand at the finished elevation of the pavers This will assist as a guide for preserving straight joint lines and will likewise allow the installer to make modifications in the positioning of the pavers.

Buildings and concrete suppressing are typically not straight and must not be used for developing straight joint lines. Making use of string lines is vital to determine the true straightness of the edge as well. As the paver installation advances, the string lines will help decrease the requirement for small trim pieces.

These will keep a minimum joint width and enable the bed linen and jointing sand to get in in between each paver. Pavers with spacer bars are generally not laid in snug against each other given that a string line will provide consistent joint spacing.

Installation of brick pavers.

One of the most widely used techniques for the installation of pavers is hand installation of each paver. It is best to install a single row of pavers along one of the true straight lines that you have actually pulled or above the bed linen sand. The finest technique is to put a paver against another one and let it slide down into the bedding sand.

When installing pavers on a steep grade, they should be installed at the base of the grade going uphill. This will avoid the pavers from sneaking as they are being laid.

On large commercial and industrial applications, hand laying pavers would not be cost effective due to the labor intensity. The best method for installing pavers on large projects is to install them mechanically. The use of a mechanical laying machine can set up roughly 6000 - 7000 sq ft a day. There are a couple items a contractor should consider prior to installing pavers mechanically:

1.) Mechanical installers are only efficient in installing pavers in specific patterns.

2.) The professional should make certain that the maker can manufacturing and bundling pavers in the desired pattern on the pallets for easy mechanical installation.

3.) Professionals may encounter a color mixing situation coming off the bundles of pavers Poor color blending could lead to an irregular looking installation. Many Paver Installation Boca Raton manufacturers are consistent with color mixing on each package of pavers, but it is the contractor's responsibility to make sure appropriate blending in the field.

Cutting treatments for brick pavers.

Contractors typically have 2 ways of cutting pavers. Pavers are cut either by 1). A double bladed guillotine or by 2). A gas powered cut off saw or brick saw which is geared up with a diamond blade. The diamond blade cut-off saw or brick saw will supply a much cleaner and more precise cut. The majority of brick saws will have a pipe attachment on them which will enable the operator to cut the pavers damp. When cutting pavers damp, it will help reduce dust and will lengthen the diamond blades life. The operator of the brick saw must always cut the pavers far from the surface of the paver field when cutting damp, due to that the pavers will create a slurry that will stain the paver surface area. Pavers that are cut must not fit tight, enough spacing must be offered for jointing sand.

The brick saw operator should always use the proper security that is required for operating a saw, such as eye, ear, respiratory and hand security ).

Edging types

Edge restraints play a major function in the overall success of an interlocking pavement installation Edging restraints eliminate lateral motion of the pavers and hold the pavers tightly together. Particularly at the outer boundary of the paver application, without an edging restraint, your task is guaranteed to stop working with time.

Typically produced edge restraints are the most commonly utilized by contractors. Produced edging restraints can vary from, plastic edging, steel and aluminum, lumbers or precast concrete and stone.

Edging installation.

When installing your edge restraint, it needs to rest directly on top of the compressed gravel base. The compacted gravel base course need to extend a minimum of 6in beyond the perimeter of the pavers This will supply a proper structure upon which the edging restraint can sit. Manufactured edging (i.E. Plastic, steel or aluminum) must be firmly anchored into the compacted gravel base( contact the producer's literature for the advised spacing of the spikes). There are some edging restraints that will extend deeper into the gravel base or beyond the base course (i.E. Timbers or poured-in-place curbs ). Edging restraints must never be put straight on top of the bedding sand. This might result in the migration of the bedding sand and ultimate lateral movement of the pavers. If there is a possibility of losing bed linen sand between the pavers and the edge restraint, then geo textile fabric is advised. When a space in between the pavers and the edging surpasses 3/8" (10mm), then the area should be filled with cut pavers. All edging applications ought to be effectively back filled after they are installed to assist supply additional stability.

Compaction of brick pavers.

After installation, the pavers have to be compacted. The entire location that is to be compressed ought to be swept tidy of any foreign things and debris that can cause scuffing or scratching on the surface of the pavers.

In addition, it is crucial that the very first compaction takes place before any jointing sand has actually been used to the pavers. If jointing sand is applied to the pavers prior to compaction takes place, this can trigger a bridging issue and will not allow the joints to be totally filled with jointing sand. This can likewise avoid the pavers from being properly set into the bedding sand.

When compacting the pavers, it is advised that you make a minimum of two passes in various instructions throughout the pavers. This will permit the pavers to be properly set in the bedding sand and will require the bedding sand up into the joints from the bottom of the pavers.

The compaction of the pavers is very critical to the final efficiency of the pavers. Failure to do appropriate compaction can result in deformations and pavement failure over time.


Paver pallets/bundles should be positioned in a manner not to interfere with the paver installation. One of the most widely utilized methods for the installation of pavers is hand installation of each paver. The operator of the brick saw ought to always cut the pavers away from the surface area of the paver field when cutting damp, due to the fact that the pavers will create a slurry that will stain the paver surface area. Edging restraints get rid of lateral movement of the pavers and hold the pavers securely together. When a space between the pavers and the edging surpasses 3/8" (10mm), then the area should be filled with cut pavers.